Join i-Club
Q&A Contact Us

Past Events Details

Webinar for the North Lantau Hospital Hong Kong Infection Control Centre (HKICC)

To cope with the COVID -19, the Hong Kong Government has built the Infection Control Centre (HKICC) with 136 Negative Pressure Wards and 816 beds at AsiaWorld - Expo, which was completed in January 2021. This is the first Infection Control Centre built with MiC method in Hong Kong.  The project only took about 4 months which is much faster than a hospital built with traditional building method. In this webinar, we will invite representatives of the project team from Architectural Services Department and China State Construction Engineering (Hong Kong) Limited to share the design concept and how the MiC technology was applied in this project.

Speakers: 

Mr. Allen LEUNG, Project Director 4, Architectural Services Department

Mr. Ben YEUNG, Chief Technical Adviser/ Central Management Division 1,  Architectural Services Department

Mr. Sunny AU, Project Director, China State Construction Engineering (Hong Kong) Limited

Mr. ZHANG Yi, Assistant General Manager, China State Construction Engineering (Hong Kong) Limited

Watch replay!

DATE
2021.03.12
 
TIME
16:00 - 17:30
 
LANGUAGE
Cantonese with English presentation materials